Solar Panel Installation Process in UP — Step by Step (2025)

From enquiry to ₹1,08,000 subsidy in your bank — the complete 10-step journey. Typically 45–60 days end-to-end.

1
Day 1
Calculate & Quote
2
Day 2–5
Site Survey
3
Day 10–14
Installation
4
Day 15–45
Net Meter
5
Day 30–45
₹78K Subsidy
6
Day 45–65
₹30K Subsidy
Phase 1: Planning
🧮
STEP 01
Day 1

Calculate Your Requirements

Use SolarBijli's solar calculator to determine your system size based on monthly electricity bill. For a ₹2,500/month bill, you need approximately 2.5–3 kW. For ₹3,500/month, approximately 3.5–4 kW.

Enter monthly bill in calculator
Choose your city (Noida/Meerut/etc.)
View subsidy & EMI breakdown
Request free quote

💡 Expert Tip: Most UP homes with bills of ₹1,500–₹4,000/month get 3kW systems — perfect to maximise the ₹1,08,000 subsidy.

🌐
STEP 02
Day 1–3

Register on PM Surya Ghar Portal

Visit pmsuryaghar.gov.in and register using your mobile number and PVVNL/UPPCL consumer number. This is mandatory to claim the government subsidy.

Visit pmsuryaghar.gov.in
Register with mobile + consumer number
Select state: Uttar Pradesh
Select DISCOM: PVVNL/UPPCL

💡 Expert Tip: Our partners help you complete portal registration during the site survey — you don't need to navigate this alone.

Phase 2: Survey & Design
🏠
STEP 03
Day 2–5

Free Site Survey by MNRE Engineer

An MNRE-certified engineer visits your home to assess: roof area and orientation, shading analysis, roof structural integrity, electrical load and current connection, best panel placement for maximum generation.

Roof measurement & shade analysis
Electrical load assessment
System design & layout
Detailed quotation with subsidy breakdown

💡 Expert Tip: South-facing rooftop at 15–30° tilt gives best results in UP. Even east-west or flat roofs work well with proper mounting.

📋
STEP 04
Day 5–10

Vendor Registration & Loan Application

The installer registers as your chosen vendor on the PM Surya Ghar national portal. If you're taking a bank loan, apply through jansamarth.in. The bank disburses funds directly to the installer.

Vendor selected on PM Surya Ghar portal
Loan application on jansamarth.in (if needed)
Bank reviews & approves (usually 3–5 days)
Loan disbursed to installer

💡 Expert Tip: SBI, Canara Bank, PNB, Union Bank all offer 7% loans with no collateral up to ₹2L. Apply on JanSamarth.in.

Phase 3: Installation
STEP 05
Day 10–14

Solar Panel Installation

Installation typically takes 2–3 working days depending on system size. The certified team installs: mounting structure (GI/aluminium), solar panels (MNRE-approved ALMM listed), grid-tied inverter, AC/DC cables & conduits, safety equipment (MCB, isolators, earthing).

Mounting structure installation
Solar panel placement & wiring
Inverter & protection equipment
Earthing & safety checks
Internal wiring to main DB

💡 Expert Tip: All equipment must be ALMM (Approved List of Models and Manufacturers) listed by MNRE — our partners only use approved brands.

STEP 06
Day 14–16

System Testing & Documentation

After installation, the engineer tests the complete system: panel output testing, inverter commissioning, safety equipment verification, performance monitoring setup, and documentation for portal submission.

Full system performance test
Photos of installation uploaded to portal
Plant commissioning report prepared
Net meter application filed with PVVNL

💡 Expert Tip: A well-functioning 3kW system in UP should generate 420–500 units/month in peak summer. Our partners provide performance monitoring.

Phase 4: Grid Connection
🔌
STEP 07
Day 15–45

PVVNL Net Meter Installation

After installation, the installer files a net metering application with PVVNL/UPPCL. DISCOM conducts an inspection and replaces your old meter with a bidirectional smart meter. This is the most time-sensitive step.

Net meter application filed
PVVNL inspection scheduled (10–20 days)
Bidirectional meter installed
Commissioning certificate issued

💡 Expert Tip: Our partners have established relationships with PVVNL officers across all 12 West UP cities to expedite this process.

Phase 5: Subsidy
💰
STEP 08
Day 30–45

Subsidies to Your Bank (₹1,08,000 total)

After the commissioning certificate is uploaded on the PM Surya Ghar portal, MNRE reviews and approves. The Central Financial Assistance (CFA) of ₹78,000 is transferred directly to your Aadhaar-linked bank account via DBT.

Commissioning certificate uploaded
MNRE review & approval
CFA of ₹78,000 + UPNEDA ₹30,000 transferred via DBT
Credit confirmation SMS received

💡 Expert Tip: Use the ₹1,08,000 total subsidy to make a part-prepayment on your bank loan immediately — this reduces your EMI significantly.

🏛️
STEP 09
Day 45–65

UPNEDA State Subsidy (₹30,000)

The UP State Government (UPNEDA) releases an additional ₹30,000 subsidy automatically after the central CFA is credited. No separate application is needed. UPNEDA processes this based on the central subsidy data.

Central CFA confirmed with UPNEDA
UPNEDA processes state subsidy
₹30,000 credited to bank account
Total received: ₹1,08,000

💡 Expert Tip: Keep your bank account documents handy. If you don't receive UPNEDA subsidy within 60 days of CFA, contact UPNEDA at upneda.org.in.

Phase 6: Enjoy!
🌟
STEP 10
Month 2+

Start Saving & Earning from Solar

Your solar system is operational. Your PVVNL bill now shows both imports (from grid) and exports (to grid). Monthly savings typically range from ₹1,500 to ₹3,500 depending on your consumption and system size.

Monitor generation via inverter app
Review monthly net metering bill
Annual maintenance check (free, 2 years)
Track savings vs old electricity bills

💡 Expert Tip: A 3kW system generates ~420 units/month in UP. If you use 300 units, you export 120 units — those are credited at ₹7.5/unit.

Documents Checklist

🪪
Aadhaar Card
Identity proof, must be mobile-linked for DBT
💡
Latest Electricity Bill
With consumer number clearly visible
🏦
Bank Account Details
Aadhaar-linked account for subsidy transfer
📸
Passport Photo
For vendor registration (some cases)
🏠
Property Documents
Or self-declaration of rooftop ownership
📱
Aadhaar-linked Mobile
For OTP verification on portal

Ready to Start Your Solar Journey?

Book a free site survey today. Our MNRE-certified engineers across 12 West UP districts will assess your roof and design the perfect system.